LEED / Academic

SEV Çekmeköy Campus


SEV Çekmeköy Campus, which offers preschool and middle school education, has been awarded LEED v4 Platinum certification from the US Green Building Council (USGBC), becoming Turkey’s third school project to achieve PLATINUM level certification under the LEED v4 BD+C: Schools. It is also the first project in Turkey to be awarded a Platinum level certificate […]

Click for detailed info

Kadıköy Atatürk Science High School


KADIKÖY ATATÜRK SCIENCE HIGH SCHOOL project has been awarded the PLATINUM level certificate in the LEED v3 School category. It became the first public school to receive LEED Platinum certification in Europe and Asia as of 30.10.2020, when it received the certificate. In this context, many environmental and human friendly features have been integrated into […]

Click for detailed info

Acibadem University Kerem Aydinlar Campus; The Vocational High School


The Vocational High School building located at Acibadem University Kerem Aydinlar Campus has become the second LEED certified building on campus with the right to obtain a LEED Gold certificate. Acıbadem University Kerem Aydınlar Campus is located on a previously developed site, very close to public transport facilities and social facilities. During the construction process, […]

Click for detailed info

Acıbadem University Faculty of Medicine


Acıbadem University’s Kerem Aydınlar Campus Medical Faculty building, which is located in Ataşehir and which belongs to Acıbadem Group one of the biggest hospital chains in Turkey, is entitled to receive LEED Gold certification. The Acıbadem University Faculty of Medicine building, which was designed and built considering the sustainability criteria from the concept project stage, […]

Click for detailed info

Özyeğin University Campus


The new campus built by Özyeğin University in Çekmeköy targets LEED Gold certification. Some of the issues that are envisaged to be implemented in this building include: The maximum attention will be paid to the preservation of natural life during and after the construction site. The proportion of the areas to be planted in the […]

Click for detailed info

Sabancı University Nanotechnology Building


In the context of the building which will be an important center for nanotechnology in Turkey, great importance is attached to environment friendly applications. Some of the features that are designed to comply with international sustainability criteria are: Energy efficient ventilation systems, while high air quality is achieved at the same time. The building’s lighting […]

Click for detailed info

Acıbadem Altunizade Hospital


Acıbadem Altunizade Hospital, which is continuing in Altunizade, İstanbul, has 75.000 m2 closed area and 17.000 m2 land area. The design and construction of a fully equipped hospital with 250 bed capacity aimed to be completed by the beginning of 2017 is being carried out by the Acıbadem Group and the project is a candidate for […]

Click for detailed info

IPKB Dr. Lütfi Kırdar Kartal Training and Research Hospital


Within the scope of ISMEP project, the existing hospital will be demolished and the 1000-bed fully equipped project will be completed by the end of 2017. The total covered area of the hospital  is 270.000 m2 and the land area is 124.000 m2. The building is a Gold Certified candidate in the LEED Healthcare category. […]

Click for detailed info

IPKB Okmeydanı Training and Research Hospital


Okmeydanı Education and Research Hospital is being rebuilt with seismic isolation technology within the scope of ISMEP project. The project is targeted to be completed in 2018. All single and double rooms of the new hospital planned as a general service hospital will be made in accordance with the definition of qualified patient bed created […]

Click for detailed info

IPKB Göztepe Education and Research Hospital


  Göztepe Education and Research Hospital, where the same campus Medical Faculty and R&D building will be located, is being rebuilt with seismic isolation technology within the scope of ISMEP project. The project is targeted to be completed in 2018. All single and double rooms of the new hospital planned as a general service hospital […]

Click for detailed info