IPKB Okmeydanı Training and Research Hospital


Okmeydanı Education and Research Hospital is being rebuilt with seismic isolation technology within the scope of ISMEP project. The project is targeted to be completed in 2018. All single and double rooms of the new hospital planned as a general service hospital will be made in accordance with the definition of qualified patient bed created […]

Click for detailed info

IPKB Göztepe Education and Research Hospital


  Göztepe Education and Research Hospital, where the same campus Medical Faculty and R&D building will be located, is being rebuilt with seismic isolation technology within the scope of ISMEP project. The project is targeted to be completed in 2018. All single and double rooms of the new hospital planned as a general service hospital […]

Click for detailed info

Qstudio Esentepe


Q Studio Esentepe is a candidate for LEED for Homes, a green building certificate with few examples in Turkey because it is constructed as anature conserving, energy saving, low carbon emission and high energy efficiency building.

Click for detailed info

Nurol Tower


Nurol Tower, which will be rising beside the Palace of Justice in Çağlayan , is expected to be one of the iconic structures of Istanbul very soon. Nurol Tower iscandidate for the LEED Gold certification. Certain green features of the project include: Maximum Energy Efficiency Nurol Tower has been designed to be energy efficient using […]

Click for detailed info

TAO Finance Center


TAO IFM, a Core & Shell office project with a 75,000 m2 closed area that will take place in Ataşehir Istanbul Finance Center, is a prominent project with its unequaled design and eco-friendly applications for LEED certification at Gold level. As a green building consultant, the Altensis project manages the entire sustainability process of the project.

Click for detailed info